It depends on the scope. A straightforward printed job can move quickly; fabricated, illuminated, engineered or multi-site work naturally needs more time. Approvals, access equipment and installation scheduling can also become the real lead-time drivers.
If you have an opening date, event date or vehicle booking that cannot move, tell us at the start. We would rather work backwards from the real deadline than give you a generic lead time that doesn’t help.